How to track extra work on landscaping jobs before it goes unbilled
A guide from Scrivell ·
On almost every landscaping job, something changes once the crew is on site. The customer asks for one more bed, the mulch runs short, a sprinkler head turns out to be cracked. The work gets done, and it’s often worth doing. The trouble is what happens next: somewhere between the property and the office, the change gets lost, and the extra work is never billed.
This guide covers why that happens, which extras are missed most often, and a simple process that gets them onto the invoice, with or without software.
Why extras on landscaping jobs go unbilled
It’s rarely carelessness. Extras slip through because of how the information has to travel:
- They’re agreed out loud. The customer says yes in the driveway, and there’s no paperwork, because stopping to write a change order for a yard of mulch feels like overkill.
- The person who agrees isn’t the person who bills. The crew lead knows exactly what was added. The invoice is written in the office, days later, from whatever made it back.
- The details are scattered. A text to the owner, a voice memo to the office, a receipt in the cab, a note scribbled on the work order. Nobody sees the whole picture.
- Memory fades fast. By the end of a busy week, “the Garcia job had something extra” is all anyone can recall, and a vague extra is hard to bill with confidence.
The extras most often missed
Big changes usually get a proper conversation and a price. It’s the small and medium ones that disappear:
- More material than the estimate
- An extra yard of mulch, soil or stone because the beds were deeper or bigger than they looked.
- Small additions
- Edging one more bed, adding a step, extending a border while the crew is already there.
- Plant swaps and upgrades
- Replacing a dead shrub, or a bigger size because the customer asked on the day.
- Extra cleanup and haul-away
- Brush, sod or debris beyond what the quote covered.
- Repairs found on site
- A cracked sprinkler head, broken edging or a damaged downspout extension fixed on the spot.
- Time lost to site conditions
- Rock, roots or drainage problems, where your contract lets you bill for them.
- Return visits
- Coming back to finish, fix or replace something, which needs its own line on the bill.
Any one of these is small. Across a season and several crews, they add up to real money, and to customers who got work they never paid for.
Capture it while it’s fresh
The best time to record an extra is before the truck leaves the property. It doesn’t need a form. It needs five details, which fit in a sentence or two:
- The job
- The customer or property, in words the office will recognize.
- What changed
- The work added, in one plain sentence.
- How much
- Quantities of material, and the hours it took.
- The price, if one was given
- Only if someone quoted it on site.
- Who agreed, and how
- The customer said yes in person, by text or by phone.
Something like this is enough:
“Williams backyard: edged the back beds and swapped two dead boxwoods, about an hour and a half. Homeowner okayed it in person.”
Spoken or typed, that message gives the office everything it needs to bill the work, and nobody has to remember it later.
A simple manual process for documenting extra work
You don’t need new software to stop losing extras. You need a routine everyone follows. This one works with a phone and a spreadsheet:
01Pick one place extras go
One group text, one shared notebook, one voice-memo thread: anything, as long as it’s the same place every time. Extras get lost most when they’re spread across five phones and a clipboard.
02Record it before leaving the property
A two-line message with the five details above, sent from the truck. It takes less than a minute while it’s fresh, and much longer to rebuild on Friday.
03Take a photo
Before and after, or just after. A photo settles “what did you actually do?” faster than any description, and it helps if the customer asks later.
04Confirm larger changes with the customer in writing
For anything beyond a small addition, send the customer a short text or email: what you’re adding and the price. Their reply is your record of the agreement.
05Review it in the office every day
Someone reads the day’s extras, matches each one to its job, and asks the crew lead about anything unclear while they still remember.
06Put it on the invoice, then mark it done
Add each confirmed extra to the job’s invoice or change order, and tick it off where you recorded it, so nothing is billed twice or missed.
07Sweep the week
Once a week, compare what each job was quoted with what the crew reported. Gaps are usually extras that never made it into the system.
Where the manual process gets hard
The routine works, but it puts the weight on the office. Someone has to replay voice memos, decipher quick notes, work out which job “the place on Maple” means, and retype it all into a record before it can be billed. On a busy day, extras arrive alongside hours, receipts and follow-ups in the same thread, and pulling them apart takes longer than the work they describe. That’s usually the point where the routine starts to slip.
How Scrivell takes the typing out of it
Scrivell keeps the same routine and does the office’s reading and retyping. Crews text a dedicated Scrivell number from the phones they already carry: a voice memo, a text or a photo. Nothing to install, and no crew onboarding.
Scrivell transcribes each message and splits it into records: change orders for extra work, labor logs for hours, materials purchases from receipt photos, and to-dos for follow-ups. Each record is matched to its job by the customer name or nickname the crew used. When it isn’t sure which job is meant, or whether the customer agreed, it flags the record instead of guessing.
What the office sees · example
Williams backyard
Voice memo · 1:35 PM
“Williams backyard. Edged the back beds and swapped two dead boxwoods. Homeowner okayed it.”
Change order · Williams
- + Edge back beds
- + Replace 2 boxwoods
- Customer agreed
The office reviews each record in one feed, plays back the original memo if needed, and confirms, edits or discards it. Nothing moves on until a person has checked it.
Getting confirmed extras onto the invoice
Scrivell doesn’t write invoices or connect to your accounting software, and it doesn’t need to. Once a change order is confirmed, copy its one-line summary and paste it wherever your billing happens: your invoicing tool, an estimator’s inbox or the office group chat. Then mark it handed off, and later done, so you can always see which extras have reached billing and which are still waiting.
The short version
- Most extras are agreed verbally on site and lost in the handoff to whoever writes the invoice.
- Capture five details while it’s fresh: the job, what changed, how much, the price if given, and who agreed.
- Keep extras in one place, add a photo, and confirm larger changes with the customer in writing.
- Review daily, bill confirmed extras, mark them done, and sweep the week for gaps.
See how Scrivell works for landscaping companies, or read about the four record types. For larger changes, use our free landscaping change order template.